Lessons Learned
Lessons Learned from Events
EEA Load Shed
February 2, 2011, Winter Event
Generator Instrument Air Failures
Generator Step-Up High Side Switch Failure
Generator Step-Up High Side Switch Moisture Ingress
Generator Trip Due to Low Auxiliary Bus Voltage
Lessons Learned from Sept 8, 2011, Southern California Event
Low SF6 Trip Logic Leads to Inadvertent Trips
Misoperations Lead to Multiple Element Loss
Outage Coordination Error Leads to Load Loss
WGR Trip Due to Firmware Upgrade
Combined Cycle Trips Due to Lean Combustion