Today, the Blackstart and Next-Start Resource Availability in the Texas Interconnection report was released. This study was jointly conducted by the Federal Energy Regulatory Commission (FERC), North American Electric Reliability Corporation (NERC), and Regional Entity staff as recommended by the 2021 report on Winter Storm Uri. Electric and natural gas entities in Texas volunteered to participate in the study that covered blackstart resource testing, fuel-switching, fuel delivery infrastructure, fuel supply contracts, and coordination between electric and natural gas entities. The report details observations and provides specific recommendations for the electric and gas industries. Texas RE staff contributed to this report and participated in presenting it to the FERC Commissioners.